Live-in container house just out of the factory is very strong, is through the test, there will be no water leakage. But the use of a long time will inevitably appear a variety of problems, then how to solve the problem of water leakage of the container house, there are those measures, the following is to answer for you.
1, waterproofing membrane
Clean up the grass-roots level, the reverse side of the coil and grass-roots level brush bonding adhesive, according to pop up a good baseline from far and near the paste, roll pressure, and then do the joints to close the head to check the processing, after the completion of the water should be done after the water storage test. Container manufacturers will be based on the environmental climate of the project site is different, the insulation materials used for heat preservation will also have some differences, container room manufacturers design the container room wall/ceiling will generally be applied to decorate the wall/ceiling of the pine board, gypsum board, cement fiberboard, polymer assembly board, aluminum alloy carving board, anticorrosive wood and so on;
2、Painting waterproof
To “one cloth two coats” as an example: clean up the grass-roots level, full brush once paint, dry film, lay a layer of fiberglass cloth carcass reinforcement materials, and has been spread on the surface of a full layer of paint fixed, container manufacturers remind dry after the next roof waterproofing construction. Container room interior spray polyurethane foam, add glass rock wool board to be used for moisture corrosion heat insulation sound insulation. South indoor addition of air conditioning, the north is added floor heating, etc.; reputable container manufacturers strongly recommended that the outer layer covered with decorative materials, such as pine board, gypsum board, cement fiberboard, polymer assembly board.
3, laying rigid waterproof layer
Professional container house manufacturers say should be in the first flexible waterproof layer is completed about two days after the construction, mainly high-grade fatty acid mortar waterproofing agent, cement, sand, fine stone aggregate, fiber as the basic materials, waterproofing layer thickness should be container house manufacturers requirements. Container room interior in order to meet the wall and ceiling fire, heat insulation and other requirements, container manufacturers recommend that the interior of the thickness of the standard glass rock wool sandwich panel for decoration.
Post time: Oct-29-2024