Activity room and building almost, will be surrounded by the partition wall foundation leveling, reinforced concrete, relatively strong; then set up columns, with horizontal beams will be connected to the skeleton, on the partition, exterior wall panels and door and window frames; followed by paving the floor, and then up to the top of a layer, and then on the roof frame and roof panels; installation of doors and windows and so on, and pull the vertical support. Then there are sanitary ware ah, small hardware and so on. In fact, this is light steel structure, and heavy steel structure plant is very similar.
Activity room hidden project refers to the construction process, after the completion of the last process, will be covered by the next process, all completed can not be checked parts, do room decoration, “hidden project” is the key, if “hidden project” is not done, the surface is also in vain. If the “hidden project” is not done, the surface is decorated beautifully, but also in vain.
“Hidden works” can be divided into water installation, electrical installation and moisture-proof, waterproofing and other projects. Each of these projects can not be ignored, if any one of the links out of the problem, may bring serious economic losses, and even bring harm. Waterproofing construction process and material identification, to avoid unnecessary economic losses and injuries.
Post time: Nov-16-2024